Notice of Funding Opportunity for the Fiscal Years 2025 and 2026 Congestion Relief Program


A new Notice of Funding Opportunity (NOFO) has recently been announced. Click the link below for additional information and to read the respective flyer. 

Title: Fiscal Years 2025 and 2026 Congestion Relief Program
Agency: U.S. Department of Transportation (DOT), Federal Highway Administration (FHWA)
Deadline: December 17, 2026

Summary: The Fiscal Years 2025 and 2026 Congestion Relief Competitive Grant Program provides up to $100 million to advance innovative, integrated, and multimodal solutions to highway congestion in the most congested metropolitan areas of the United States. The program aims to reduce highway congestion, reduce the economic costs of congestion, and optimize existing highway capacity. The minimum award is $10 million ($12.5 million minimum total project cost) with no maximum award size, and FHWA anticipates awarding fewer than 10 projects as cost reimbursable grants with a period of performance of 1 to 4 years. A minimum 20 percent non-Federal cost share is required.

Eligible applicants include States, metropolitan planning organizations, and cities or municipalities, each carrying out a project in an urbanized area with a population of more than one million. Eligible projects include integrated congestion management systems; systems to implement or enforce HOV toll lanes, cordon pricing, parking pricing, or congestion pricing; mobility services such as commuter buses and vans, express operations, paratransit, and on-demand micro-transit; and incentive programs for carpooling, nonhighway travel during peak periods, or off-peak travel.

Applications are submitted through Grants.gov by December 17, 2026, 11:59:59 PM ET with the SF-424 family forms and the Congestion Relief Application Template, and an active SAM.gov registration is required. Applications will be rated on three merit criteria: Reduce Highway Congestion; Reduce Costs Associated with Congestion and Promote Economic Competitiveness; and Optimize Existing Highway Capacity Including Through Emerging Transportation Technologies, followed by a Project Readiness Assessment. By statute, DOT gives priority to urbanized areas experiencing a high degree of recurrent congestion. DOT anticipates announcing award selections in early 2027.